NEC Working Space Requirements: Table 110.26(A)(1) Explained

NEC working space requirements, Table 110.26(A)(1) - JCR Productions

The 2020 NEC (NFPA 70) requires a clear space in front of electrical equipment at least 3 ft deep, 30 in. wide and 6½ ft high. Depth grows to 3½, 4 or 5 ft with higher voltage to ground, depending on what's behind you. Find your depth with the calculator below.

It applies to equipment of 1000 V or less to ground likely to need examination, adjustment, servicing or maintenance while energized. Examples: panelboards, switchboards, switchgear and motor control centers.

Working space depth calculator: Table 110.26(A)(1)

Depth depends on two things: the voltage to ground and what faces the live parts across the aisle. At 150 V or less to ground, it's 3 ft whatever is across from you.

Pick your voltage and conditions.

Covers the front working space for equipment of 1000 V or less to ground. Height grows with taller equipment, and doors must open at least 90°.

Measure from the exposed live parts, or from the front of the enclosure or its opening if they're enclosed.

Example: in an existing building, you replace a dead-front 480Y/277 V panelboard that faces another dead-front panelboard across a 3½ ft aisle. Condition 3 calls for 4 ft. Add written procedures that keep both from being open at once, with only authorized qualified persons (workers trained on the equipment and its hazards) servicing them. Then 110.26(A)(1)(c) allows the Condition 2 depth of 3½ ft, and the aisle passes.

The three conditions in plain words

  • Condition 1: live parts on one side, nothing live or grounded on the other. Also applies when live parts on both sides are guarded by insulating material.
  • Condition 2: live parts on one side, grounded parts on the other. Concrete, brick and tile walls count as grounded.
  • Condition 3: exposed live parts on both sides, such as equipment facing equipment. In existing buildings where equipment is replaced, 110.26(A)(1)(c) allows Condition 2 under written procedures that keep both sides from being open at once.

Voltage to ground: 480Y/277 V is 277 V to ground, and 120/240 V is 120 V to ground. On an ungrounded system, use the highest voltage between any two conductors.

Studying for your electrical exam? JCR's $495 self-study package has 500+ practice questions (digital and printed), 100 video lessons, a 152-page study manual and permanent code tabs. Videos and the digital practice exams open right after you order.

Pick your state's package

Testing in North Carolina? Take JCR's NC exam prep class: two full days in person ($845) in Raleigh, Asheville, Mooresville (Charlotte area) or Winston-Salem, or live on Zoom on Tuesday evenings and Saturday mornings. 93% pass rate for JCR classroom students.

See NC class dates

Width, height and other NEC working space requirements

Rule What the 2020 NEC requires
Width (A)(2) 30 in. or the width of the equipment, whichever is greater. Doors and hinged panels must open at least 90 degrees.
Height (A)(3) 6½ ft or the height of the equipment, whichever is greater, from the floor or platform. Related equipment above or below, like a concrete pad, may stick out up to 6 in. past the front.
Height exceptions Existing dwelling service equipment or panelboards up to 200 A may have less than 6½ ft. Meters in meter sockets may stick out past other equipment.
Clear space (B) No storage in the working space. If live parts are exposed in a passageway, guard the area.
Lighting (D) Required indoors at service equipment, switchboards, switchgear, panelboards and motor control centers. Automatic controls can't be the only control for all of it.
Limited access (A)(4) Above a lay-in ceiling, an opening at least 22 × 22 in. In a crawl space, an opening at least 22 × 30 in. Width and depth rules still apply.

Dedicated equipment space: 110.26(E)

Switchboards, switchgear, panelboards and motor control centers also need a dedicated space, separate from the working space.

  • Indoors: the equipment's width and depth, from the floor to 6 ft above it or the structural ceiling, whichever is lower.
  • Keep out: piping, ducts, leak protection equipment and anything else foreign to the electrical installation.
  • Allowed: a suspended ceiling with removable panels, and sprinklers.
  • Outdoors: grade to 6 ft above the equipment. Structural overhangs and roof extensions are allowed.

Entrance and exit rules: 110.26(C)

  • Every working space: at least one entrance big enough to get in and out. Open equipment doors can't block it.
  • 1200 A or more and over 6 ft wide: an entrance at each end, at least 24 in. wide and 6½ ft high. Service disconnects with a combined 1200 A or more over 6 ft wide count too.
  • One entrance is enough with a continuous, unobstructed exit path, or twice the Table 110.26(A)(1) depth.
  • 800 A or more with overcurrent, switching or control devices: personnel doors within 25 ft must open in the direction of exit travel. They need listed panic or fire exit hardware.

Table 110.26(A)(1) is easy to tab. Mark it in your 2020 NEC softbound book. See JCR's guide on how to tab your code book.

Worked example: a commercial electrical room

An electrical room has block walls on each side of a 6 ft aisle.

  1. 480Y/277 V panelboard, 20 in. wide, facing block: 277 V to ground, and block is grounded (Condition 2). Depth 3½ ft, width 30 in., height 6½ ft.
  2. Its dedicated space: 20 in. wide by the panel's depth. Keep the HVAC duct out.
  3. Second 480Y/277 V panelboard facing the first: Condition 3, so 4 ft. The 6 ft aisle passes.
  4. 1600 A, 480Y/277 V switchboard, 8 ft wide: an entrance at each end, 24 in. by 6½ ft. Or one entrance with unobstructed egress or doubled depth (2 × 3½ ft = 7 ft).
  5. Room door 15 ft away: it's within 25 ft of 800 A or more equipment. It must open in the direction of exit travel, with listed panic or fire exit hardware.

Common working space exam traps

  • Using phase-to-phase voltage. A 480Y/277 V panel uses 277 V.
  • Mixing up the two 6s. Working space height is 6½ ft from the floor. The dedicated space runs 6 ft above the equipment.
  • Width equals panel width. The minimum is 30 in., even for a 14 in. panel.

These dimensions are from the 2020 NEC. If your state enforces a different edition, see NEC adoption by state or JCR's state requirements page.

Working space questions

How much clearance do you need in front of an electrical panel?

A typical 120/240 V home panel is 120 V to ground, so 3 ft of depth. The space must be at least 30 in. wide (or the panel width, if wider) and 6½ ft high. Doors must open at least 90 degrees.

What is the working space for a 480 volt panel?

A 480Y/277 V panel is 277 V to ground, so it uses the 151–600 V row. Depth is 3 ft for Condition 1, 3½ ft for Condition 2 and 4 ft for Condition 3.

Can anything be installed above an electrical panel?

Not in the dedicated space, which runs up to 6 ft above the panel or the structural ceiling, whichever is lower. Pipes and ducts stay out. Above it, foreign systems are OK if the panel is protected from leaks, condensation and breaks.

When does a working space need two entrances?

When equipment rated 1200 A or more is over 6 ft wide. Each entrance must be at least 24 in. wide and 6½ ft high. One entrance is allowed with unobstructed egress or doubled depth.

Does an existing house need 6½ ft of headroom for a new panel?

Not at 200 A or less. Exception No. 2 to 110.26(A)(3) lets that equipment sit under 6½ ft of headroom in an existing dwelling unit. It covers service equipment and panelboards. Depth and width rules still apply.

Know Table 110.26 cold on test day

Table 110.26 questions are quick points once you've drilled them. JCR's $495 self-study package covers Article 110 with video lessons and practice exams, in versions for 14+ states.

Pick your state's package — $495

Prefer a classroom? In North Carolina, JCR's two-day exam prep workshops meet in Raleigh, Asheville, Mooresville (Charlotte area) and Winston-Salem, or live on Zoom.

Not sure which books to bring? See JCR's exam book list, or try 25 free NEC practice questions.

Choose your state's self-study package

Each package is built for that state's exam and NEC edition. Pick yours:

Not sure which exam you need? See your state's license and exam requirements.

Related guides: 200 amp service wire size (Table 310.12) · Main bonding jumper size (250.28) · Dwelling service load calculation

More worked examples: all NEC Answers.

References

JCR checked every dimension above against the 2020 NEC in NFPA LiNK on October 21, 2026.