Try these ten NC Unlimited electrical exam practice questions with your 2020 NEC and NC licensing references. Write your answer and the supporting section before opening each explanation. Set a 36-minute timer to practice roughly the pace of the 100-question, six-hour exam.
These JCR-written questions focus on subjects the official outline lists for Intermediate and Unlimited but not Limited: high voltage, hazardous locations, elevator machine rooms, emergency systems, health care and places of assembly. They also include aircraft hangars, which the outline lists only for Unlimited, and a licensing-law question. For large services and motor calculations, work through the eight questions in our NC Unlimited license guide.
1. High-voltage working space
Switchgear on a solidly grounded 12,470Y/7,200-volt system has exposed live parts on one side of the aisle and a concrete wall on the other. What is the minimum depth of working space?
Show answer and explanation
5 feet. The table is based on voltage to ground, so use 7,200 volts, not 12,470. A concrete wall counts as grounded, which makes this Condition 2. In the 2,501–9,000 volt row, Condition 2 requires 5 feet. 2020 NEC 110.34(A) and Table 110.34(A).
2. Transformer primary protection over 1,000 volts
A 1,000 kVA, 12,470-volt to 480-volt, three-phase transformer has 5.75% impedance and is installed in an unsupervised location. The primary is protected by fuses. Before any next-size allowance, what is the maximum fuse rating?
Show answer and explanation
About 139 amperes. Primary current is 1,000,000 ÷ (1.732 × 12,470) = 46.3 A. The "any location" part of the table allows fuses at 300% for this impedance: 46.3 × 3 = 138.9 A. If that isn't a standard rating, Note 1 permits the next higher commercially available rating for fuses over 1,000 volts. The 600% figure is for circuit breakers. The same table also requires secondary protection. 2020 NEC Table 450.3(A).
3. Conduit seal location
A conduit enters an explosionproof enclosure containing a switch in a Class I, Division 1 location. The enclosure marking doesn't state a different distance. How far from the enclosure may the seal be installed?
Show answer and explanation
No more than 18 inches. A switch can produce arcs, so each conduit entry into its explosionproof enclosure needs a seal within 18 inches. Exceptions remove the seal requirement in limited cases, such as a switch in a hermetically sealed chamber. 2020 NEC 501.15(A)(1).
4. Aircraft hangar floor
In an aircraft hangar, how high above the floor does the general classified area extend, and what is its classification? Leave out pits and the area around the aircraft.
Show answer and explanation
Up to 18 inches above the floor, Class I, Division 2 (or Zone 2). This covers the entire hangar, plus adjacent and communicating areas not suitably cut off from it. A pit or depression below the floor is stricter: Class I, Division 1 (or Zone 1), up to floor level. 2020 NEC 513.3(A) and (B).
5. Fuel dispenser emergency shutoff
You are locating the emergency shutoff for a motor fuel dispensing system. What are the minimum and maximum distances from the dispensers it serves?
Show answer and explanation
At least 20 feet and no more than 100 feet. The shutoff must be clearly identified and in an approved location. It must disconnect power to all dispensing devices, the remote pumps serving them, their associated power, control and signal circuits, and all other electrical equipment in the classified locations around the dispensers. 2020 NEC 514.11(A).
Build speed and accuracy before exam day
Learn to find answers in the code book, work through calculations and practice for test day.
All three options include JCR’s study materials. JCR also carries the 2020 NEC (NFPA 70) and 2013 NFPA 72 code books.
6. Elevator machine room lighting
An installer wants to feed the required machine room lighting from the load side of a GFCI receptacle in the same room. Is that allowed?
Show answer and explanation
No. Required machine room lighting can't be connected to the load side of a GFCI. The lighting also needs a branch circuit separate from the receptacle circuit, and these circuits can't supply other loads. 2020 NEC 620.23(A).
7. Emergency system transfer time
The normal supply to a building fails. What is the longest the Article 700 emergency system may take to supply power? How does that compare with a legally required standby system?
Show answer and explanation
10 seconds for emergency systems, 60 seconds for legally required standby. Those are outer limits: if the application requires a shorter time, that time controls. Check the article number first, because 700 and 701 use similar wording with different times. 2020 NEC 700.12 and 701.12.
8. Critical care receptacles
How many receptacles must be provided at each patient bed location in a Category 1 (critical care) space?
Show answer and explanation
At least 14. A Category 2 (general care) bed location needs at least 8, so identify the space category first. In Category 1, at least one of the 14 must be on a normal system branch circuit or on a critical branch circuit supplied by a different transfer switch than the bed's other receptacles. 2020 NEC 517.18(B)(1) and 517.19(B)(1).
9. Places of assembly
A new restaurant is designed for 120 people. Does Article 518 apply?
Show answer and explanation
Yes. Article 518 covers buildings or portions of buildings designed or intended for 100 or more people to gather for purposes that include eating and drinking. Restaurants are on its list of examples. A restaurant designed for fewer than 100 people falls outside that scope. 2020 NEC 518.1 and 518.2(A).
10. NC bonding ability statement
A company applies for an NC Unlimited license and submits a bonding ability statement. In whose name must the statement be submitted?
Show answer and explanation
The same name as the license to be issued. If a sole proprietor owns the firm, the statement may be in either the firm's name or the proprietor's name. Instead of the statement, the applicant may submit other financial information for the Board's specific approval. G.S. 87-43.2(a)(4). See JCR's bondability statement guide.
Turn your results into a study plan
Mark each answer as correct, guessed, missed or too slow. A lucky guess needs review just as much as a wrong answer.
- Missed a special occupancy? Name the occupancy first, then go straight to its article (500s for hazardous and health care, 620 for elevators, 700s for emergency systems).
- Used a low-voltage rule on a high-voltage question? Check the voltage before you open the code book. Over 1,000 volts often sends you to a different table.
- Found the right rule too slowly? Repeat the lookup the next day without your recorded reference.
Then take a mixed mock exam so you practice these topics alongside calculations, grounding and motors. Our six-week NC study plan shows how to work the lessons and practice into your week.
NC Unlimited practice test questions
How many questions are on the actual exam?
The NC Unlimited exam is 100 questions over six hours, and you need 70% to pass. Use the Unlimited column in the official exam outline to check every tested subject.
Can I prepare using only Intermediate practice questions?
They're very useful. The official outline lists almost the same subjects and nearly the same question counts for both exams. The clear difference is aircraft hangars, which only Unlimited covers, so add those to your practice. See the classification comparison.
What can I bring into the exam?
Bring your own 2020 NEC, 2013 NFPA 72 and NASCLA NC Electrical guide. Check the NC book and tab rules before your timed mock exam.
For more mixed practice, try JCR’s NC Intermediate practice test and 2020 NEC questions.
NEC questions use the 2020 edition. Review the cited sections in NFPA’s code reference. NEC citations and NC requirements checked November 9, 2026.