G16, G17 and G18 are the International Code Council's national master, journeyman and residential electrician exams on the 2017 NEC. ICC still sells all three through Pearson VUE for $120 each, and each is open book with the 2017 NEC and Ugly's. A G-series pass counts only where a licensing agency lists it, so check your city, county or state list before you buy.
ICC's national exam list pairs each series with its NEC edition, and the 2018 National Contractor/Trades bulletin (published October 12, 2026) has the format and outlines.
| At a glance | Format | Code and books | Fee | Passing score |
|---|---|---|---|---|
| G16 Master Electrician | 100 questions, 5 hours | 2017 NEC, Ugly's (any edition), open book | $120 | 75% (ICC) |
| G17 Journeyman Electrician | 80 questions, 4 hours | 2017 NEC, Ugly's (any edition), open book | $120 | Check the Exam Catalog and your agency |
| G18 Residential Electrician | 60 questions, 3 hours | 2017 NEC, Ugly's (any edition), open book | $120 | Check the Exam Catalog and your agency |
All three allow permanently attached tabs under ICC's test-site rules. After a failed attempt, you wait 10 days to retake.
Booking G16, G17 or G18? All three are graded on the 2017 NEC. JCR's Multi-State 2017 NEC package pairs 100 video lessons with a 152-page printed manual, permanent tabs for your code book and 300+ digital mock exam questions.
See the 2017 NEC package: $495
Want a baseline first? Take 25 free 2017 NEC questions with instant feedback.
Who still names G16, G17 or G18
ICC is not a licensing agency. A city, county or state decides which exam codes it accepts. These agencies list a G-series exam on their current pages:
| Jurisdiction | G-series exam named | What else to know |
|---|---|---|
| Springfield, Illinois | G16 required for an electrical license | The city's August 2025 cover memo says it uses G16, "based on the 2017 National Electric Code," with no pre-authorization. Applicants also need 5 years of experience, 2 of them overseeing work. |
| Jefferson City, Missouri | G17 Journeyman, G16 Master | The city lists these as the ICC exams its board currently accepts. A journeyman or master license is $110. |
| Wichita and Sedgwick County, Kansas | G16 for a master certificate | G16 shares the master list with 554, KGD, F16 and T16, and MABCD requires 75% or better. Its journeyman list has no G17. See the Wichita license guide. |
| Pittsburgh, Pennsylvania | T16, G16 or F16 accepted | The city's licensing office tells applicants to choose the exam that covers the most recent code year, which is T16 on the 2020 NEC. |
Kansas's state-standard exams (KGD, KGH and KGX) are also on the 2017 NEC, but they are separate exams with their own codes. JCR's Kansas exam guide covers them.
G-series vs. T-series vs. R-series
ICC sells the same three electrician exams in several code years. The letter tells you the NEC edition.
| Series | NEC edition | Master, journeyman, residential |
|---|---|---|
| F | 2014 | F16, F17, F18 |
| G | 2017 | G16, G17, G18 |
| T | 2020 | T16, T17, T18 |
| R | 2023 | R16, R17, R18 |
Buy the exact code on your agency's list. A pass on one series doesn't stand in for another unless the agency says so. ICC's T-series changes on December 1, 2026, when its exam IDs start showing the passing score. JCR's T16, T17 and T18 guide explains that change.
Passing scores: ICC's passing-score page says the master electrician exam needs 75% and most other trade exams need 70%. Your agency can set a higher bar. Check the score for your exam in ICC's Exam Catalog.
G16, G17 and G18 topic weights
| Content area | G16 (100) | G17 (80) | G18 (60) |
|---|---|---|---|
| Wiring methods and materials | 19% | 26% | 13% |
| Branch circuits and conductors | 16% | 19% | 25% |
| Services and service equipment | 16% | 11% | 22% |
| General knowledge | 12% | 6% | 12% |
| Special occupancies, equipment and conditions | 12% | 11% | 7% |
| Equipment and devices | 10% | 13% | 8% |
| Motors and generators | 8% | 6% | Not listed |
| Feeders | 4% | 4% | 13% |
| Control devices | 3% | 4% | Not listed |
- G17: wiring methods alone is about 1 question in 4.
- G18: services and branch circuits add up to 47%. Expect dwelling loads, GFCI and AFCI rules and grounding.
- G16: theory, load calculations and plan reading carry twice the journeyman share.
ICC also offers G21 Low-Voltage Electrician on the 2017 NEC: 50 questions in 3 hours, $120.
Books, tabs and calculator
ICC's test-site rules apply to every G-series exam:
- Books must be bound. A store binding, staples or a 3-ring binder all count. Copied pages from a copyrighted book do not.
- Mark your books ahead of time with highlighter or ink.
- Tabs must be permanent. If a tab can come off without tearing the page, leave it home.
- Calculators stay simple: no programming, nothing past basic math, square roots and percentages.
Carry a 2017 NEC, not a newer book. In 2020 the NEC renumbered several Article 310 tables. Conductor ampacity, for one, moved from Table 310.15(B)(16) to Table 310.16. JCR's 2017 NEC trap questions walk through more of these moves.
Set aside 6–8 weeks, about an hour a night, to get fast in the 2017 book. The study manual in JCR's Multi-State 2017 NEC package maps those weeks out for you, and its tabs are the permanent kind ICC requires.
Booking and retakes
- Confirm the exam code with your licensing agency. Some agencies require approval before you book. Springfield, Illinois, for one, has not required it since January 1, 2018.
- Book at pearsonvue.com/icc and pay $120.
- Get your result right after a computer-based exam. ICC reports only the word "PASS" to passing candidates, with no number.
- Failed? Wait 10 days before you retake.
Taking a state 2017 NEC exam instead?
Several states test on the 2017 NEC with their own exams. Each JCR state package matches its exam's books and rules.
| Your exam | JCR package ($495) |
|---|---|
| ICC G16, G17 or G18, anywhere | Multi-State 2017 NEC package |
| Kansas KGD, KGH or KGX | Kansas 2017 NEC package |
| Missouri statewide 2017 version (Prov), St. Louis County master or Springfield W16 and W17 | Missouri 2017 NEC package |
| Tennessee CE or LLE (Prov) | Tennessee 2017 NEC package |
| Arizona R-11, C-11 or CR-11 (PSI) | Arizona 2017 NEC package |
| Nevada C-2 (PSI) | Nevada 2017 NEC package |
ICC G16, G17 and G18 FAQ
What NEC edition is the ICC G17 journeyman electrician exam on?
The 2017 NEC. ICC's outline for G17 names two books you may open during the test: the 2017 NEC and any edition of Ugly's Electrical Reference. G16 and G18 use the same pair.
Is the G16 exam still offered?
Yes. ICC's national exam list and its 2018 National Contractor/Trades bulletin (October 12, 2026) still include G16, G17 and G18. Each costs $120 at Pearson VUE.
What is the difference between G16 and T16?
The NEC edition. G16 is ICC's national master electrician exam on the 2017 NEC, and T16 is the same exam on the 2020 NEC. Take the one your licensing agency lists.
What score do I need to pass G16?
75%. ICC says its master electrician exam requires 75% of questions answered correctly. Your licensing agency may set its own minimum.
Are code-book tabs allowed on G-series exams?
Yes, if they are permanently attached. ICC allows tabs that can't be removed without destroying the page, plus ink notes and highlighting.
Pass your G-series exam on the 2017 NEC
G-series exams give you 3 minutes a question, so speed in the 2017 book decides the score. The Multi-State 2017 NEC package from JCR trains that speed. Inside are 100 video lessons (21 hours in all), a printed manual and a printed mock exam booklet. Add 300+ digital mock exam questions and permanent tabs for your book. Self-study does not earn CE credit.
Get the Multi-State 2017 NEC package: $495
Your video and digital practice exam access instructions arrive by email right after you order. Printed pieces go out the same or next business day. Or test yourself first with the free 25-question 2017 NEC mock.
Sources
- ICC: National contractor exams list (August 19, 2025)
- ICC: 2018 National Contractor/Trades bulletin (October 12, 2026)
- ICC: Are the 2018 national exams available?
- ICC: What score do I need to pass?
- ICC: What to bring to the test site
- Springfield, IL: Electrical exam cover memo (August 29, 2025)
- Jefferson City, MO: Electrical licensing
- MABCD: Master and journeyman trade certificates
- Pittsburgh PLI: Electrical trade license
- Pearson VUE: ICC exams
Reviewed November 11, 2026. Exam details follow the linked ICC bulletins and agency pages, accessed November 11, 2026. Each agency keeps its own list of accepted exam codes. NEC references are to the 2017 edition.