When a qualified individual leaves your NC electrical company, you must report it to the board within 5 days. What happens next depends on who left. If it was an additional qualifier, you drop them and keep working. If it was the primary qualifier, the person the license belongs to, the company goes inactive. It can't bid or start new work until it's listed on another active license (G.S. 87-43.2).
| At a glance | North Carolina |
|---|---|
| Report the departure | Within 5 days (G.S. 87-43.2(a)(3)) |
| No qualifier left | License is cancelled (G.S. 87-43.2(b)) |
| Primary qualifier leaves | Company and license go inactive (Add/Drop form) |
| Jobs already underway | May be finished only under the board's 4 conditions (FAQ) |
| New bids and contracts | Not allowed until the company is on an active license |
| Processing time | Up to 30 days for board forms |
Primary qualifier vs. additional qualifier
In North Carolina, the electrical license belongs to a person, not the company. The board calls that person the license holder, or primary qualified individual. The company is listed under that person's license. Other qualifiers can be added to the same license as additional qualified individuals.
The first-listed qualifier keeps the license number unless they assign it in writing (Rule .0407). That's why the two cases play out so differently:
| Who left | License status | Existing jobs | New work | How to fix it |
|---|---|---|---|---|
| Additional qualifier | Stays active if the license holder remains | Continue | Continue | Drop them on the Add/Drop form within 5 days |
| Primary qualifier (license holder) | Company and license go inactive | Only if all 4 board conditions are met | No new bids or contracts | List the company under another qualifier's license with the right license application |
| Only qualifier, no replacement | Cancelled | Only if all 4 board conditions are met | No | Hire or become a qualifier, then apply |
Can existing jobs be finished?
The statute lets work already started be completed "under such conditions as the Board shall direct." The board's FAQ lists four conditions. All four must be true:
- A substantiated electrical contract for that structure and location existed before the qualifier was removed.
- An electrical permit for that structure and location was issued before the removal.
- Electrical work had begun at that location before the removal.
- Board staff and the local electrical inspector confirm that the journeymen on site can continue the project, and management moves quickly to replace the qualifier.
Emergency checklist: the first 5 days
- Find out who left. Look up your license on the NCBEEC Verify License Search. It shows the license holder and each qualifier.
- Report it in writing within 5 days. Use the Add/Drop Qualified Individual form to drop the person. Email it to Office@ncbeec.org.
- List every open job. For each one, note the contract date, permit date and start date. Those answer the board's four conditions.
- Stop bidding. If the license holder left, hold new bids and contracts until the company is on an active license.
- Call the board and your inspectors. Ask how they want open jobs handled.
- Line up a replacement. See the next section.
How to replace the qualifier
If an additional qualifier left
Add a new one on the same Add/Drop form. The new qualifier must already have passed a board exam or hold a qualification from the board. Their classification must match the license's. A qualifier can be on only one license at a time.
If the license holder left
The Add/Drop form can't change the license holder or the company name. To move the company under a new qualifier's license, the form says to use "the appropriate License Application" from the board's forms page. Call the board to confirm which application fits your situation before you file. Intermediate and Unlimited licenses also need a bonding ability statement or a bank line-of-credit letter. See what is a bond ability statement.
No qualifier on staff?
Someone at the company can test for it. You'll need the hours for the class: Limited 3,000 (2,000 primary), Intermediate 5,750 (5,000 primary) or Unlimited 9,000 (8,000 primary). Approval takes 5 to 10 business days, and then the 90-day exam window starts. Plan on several weeks at least.
Getting a new qualifier through the exam? JCR's NC exam prep class is two full days for $845 in Raleigh, Asheville, Mooresville (Charlotte area) or Winston-Salem, or $800 live on Zoom. 93% pass rate for JCR classroom students.
Prevent the next disruption
- Keep a second qualifier on the license when you can. Losing an additional qualifier doesn't stop work.
- Put the license number in writing. If the company depends on one person's license, agree on what happens if they leave.
- Check your record every quarter on the board's license search.
- Track every qualifier's CE and renewal. New qualifiers also have to take the board's free 4-hour Laws and Rules course within 12 months.
Qualifier FAQ
How long do I have to report a qualifier leaving in NC?
5 days. The statute requires licensees to report any addition or loss of a listed qualified individual to the board within five days.
Can my electrical company keep working after the qualifier quits?
Only on jobs that meet all four board conditions: a contract and permit in place before the removal, work already started, and confirmation from board staff and the local inspector. No new bids or contracts are allowed.
Can a qualifier take the license with them?
The first-listed qualifier keeps the license number unless they assign it in writing. The company then needs to be listed on another active license.
Can one person qualify two NC electrical companies?
No. A qualifier can be listed on only one license at a time.
More NC license guides
Keep every qualifier and license on track
JCR's License Management service tracks each license, qualifier, renewal date and CE requirement for you. License & CE Management is $175 per license per year. Complete License Management is $350 per license per year and also prepares and submits renewals where the state allows. Setup is a one-time $150 plus $25 per license.
Official sources
- G.S. Chapter 87, Article 4
- NCBEEC FAQ
- Add/Drop Qualified Individual form
- NCBEEC forms
- NCBEEC licensing
- NCBEEC Verify License Search
- 21 NCAC 18B .0407
JCR checked these rules against the board's public pages and forms on November 5, 2026. Rules and fees change, so confirm with the board before you file.