Skip to content

Missouri Electrical Contractor Exam Prep

Missouri’s statewide electrical contractor license requires a passing score on an exam approved by the Office of Statewide Electrical Contractors (OSEC). This page covers the NASCLA Electrical Contractor exam, given by PSI for OSEC. It has 100 scored questions, a 270-minute limit and an open-book format. You need 75 correct.

93%pass rate for JCR classroom students

20,000+electricians trained since 1985

50+ yearsin the trade for lead instructor Victor Ring

The NASCLA exam accepts the 2020 or 2023 NEC. OSEC also approves Prov’s Missouri Journeyman, Master and Residential exams, which come in 2017, 2020 and 2023 NEC versions. JCR’s package is built on the 2020 NEC, so it fits the NASCLA exam and Prov’s 2020 versions. It targets NASCLA’s Code and theory questions: 83 of the 100 through December 31, 2026, and 90 of the 100 starting January 1, 2027. The license itself is optional: you can keep working where you hold the required local license. Cities and counties must recognize the statewide license in place of a local contractor license.

The Missouri exam and license

NASCLA Electrical Contractor exam
  • 100 scored questions · 270 minutes · 75 correct to pass
  • $125 PSI fee, centers in Missouri and Kansas
  • Through 12/31/2026: Code and theory 83, Safety 9, Project Design and Management 8
  • Starting 1/1/2027: Code and theory 90, Safety 5, Project Documents 5
  • Eligible for 2 years after OSEC approval, with unlimited retakes in that time
Statewide license requirements
  • 12,000 hours installing equipment and wiring, or a shorter route with an apprenticeship, associate’s degree or electrical engineering degree
  • $500,000 in liability insurance
  • Local bonds where a city or county requires them
  • Not required where you already hold the needed local license (RSMo 324.920.4)
Course fit: what JCR covers

JCR covers the NEC lookups, wiring, equipment and theory questions with timed 2020 NEC practice. Prepare on your own for the safety questions (OSHA and NFPA 70E) and the project management questions: 9 and 8 through 2026, 5 and 5 starting January 1, 2027. Local rules such as city business licenses and permits are outside the exam. The NASCLA score also travels: see agencies that accept NASCLA.

The $495 package

Video course + workbook100 lessons totaling 21 hours, with the proprietary JCR workbook (152 pages).
500+ question mock examRealistic practice in print and with digital access, timed like the real test.
Permanent Code tabsThe NASCLA rules allow permanent tabs. Code book sold separately.

Your video and digital practice exam access instructions arrive by email right after you order. Printed materials ship the same or next business day.

How to get the Missouri statewide license
Document your hours.Show 12,000 hours, or one of the shorter routes in 20 CSR 2117-2.010, and get a $500,000 liability insurance certificate.20 CSR 2117-2
Apply to OSEC.Only the State of Missouri decides your eligibility.Office of Statewide Electrical Contractors
Schedule with PSI.After OSEC approves you, you get instructions to pay the $125 fee and book a seat. Taking a Prov exam instead? Register directly with Prov.PSI Missouri bulletin
Pass and use it statewide.Cities and counties must accept the statewide license for contracting work and permits.RSMo 324.925

Prefer a live class? Join on Zoom

Learn the 2020 NEC live with a JCR instructor from home: four 4-hour Zoom sessions for $800, with the workbook, videos, 500+ practice questions and code book tabs included. Sessions run Tuesdays 4–8 p.m. and Saturdays 7–11 a.m. Central.

Missouri exam FAQ

What exam does Missouri use for electrical contractors?

OSEC accepts several approved exams. PSI gives the NASCLA Accredited Trade Examination for Electrical Contractors. Prov gives Missouri Journeyman, Master, Residential Journeyman and Residential Master exams in 2017, 2020 and 2023 NEC versions. Some ICC exams also count. Already passed a contractor, master or journeyman exam elsewhere? Check OSEC’s approved exam list or call OSEC at (573) 522-3280.

Which NEC edition can I use?

It depends on the exam. NASCLA through PSI: the 2020 or 2023 NEC, or the NEC Handbook for either year. Prov: you pick the 2017, 2020 or 2023 version when you register. JCR teaches the 2020 NEC, so this package fits NASCLA and Prov’s 2020 versions. Taking a 2017 NEC exam instead (Prov's 2017 versions of the Missouri Journeyman, Master and Residential exams, St. Louis County, or Springfield)? Use the Missouri 2017 NEC package.

Is the Missouri electrical license exam open book?

Yes. Permanent tabs, highlighting and underlining are allowed. No writing in the books and no Post-its.

How many questions are on the NASCLA exam?

100 scored questions, plus up to 10 unscored tryout questions (starting January 1, 2027, those count against your time). You need 75 correct. Prov’s Missouri exams are shorter: 40 to 60 questions, with 70% to pass.

Do Kansas City and St. Louis still license contractors?

Cities can keep their own licenses, but they must recognize the statewide license in place of a local contractor license. They can still require permits and local bonds.

How long should I study?

6–8 weeks, about an hour a night.

Watch how JCR teaches

More reading: Missouri electrical contractor license guide · Missouri 2017 NEC self-study · NASCLA Electrical Contractor exam prep · exam requirements by state

Questions? Call (704) 696-8555 or email JCR.

Free practice: JCR quiz. It is general 2020 NEC practice, not Missouri or NASCLA exam questions.

Loading...