Alaska's electrical administrator license lets you supervise a contractor's electrical work. Most people choose Unlimited Commercial Wiring or Residential Wiring. The state approves your experience first, then you take one PSI exam based on the 2020 NEC.
| At a glance | Unlimited Commercial Wiring (UCW) | Residential Wiring (RW) |
|---|---|---|
| What you supervise | All inside wiring. No poles, towers or outside linework. | Homes up to 3 stories and 4 units. No three-phase work. |
| Experience | 4 of the past 6 years as a commercial journeyman | 2 of the past 4 years as a residential journeyman |
| Exam | One PSI exam, 2020 NEC | One PSI exam, 2020 NEC |
| Fees | $150 exam, $150 application, $170 license | $150 exam, $150 application, $170 license |
| Renewal | Every 2 years, one 8-hour NEC course | Every 2 years, one 8-hour NEC course |
What books do I need for the Alaska electrical exam?
Each administrator category has its own list. Nothing is provided at the test center, and every listed book is optional, so bring the ones you studied with.
Unlimited Commercial Wiring
- 2020 NEC (NFPA 70)
- 2013 NFPA 72
- 29 CFR 1926 (OSHA), or PSI's 29 CFR 1926 Selections
- The four Alaska law documents: Centralized Licensing Statutes, Centralized Licensing Regulations, Construction Contractor Statutes and Regulations, and Electrical Administrator Statutes and Regulations
Residential Wiring
- 2020 NEC (NFPA 70)
- National Electrical Safety Code (NESC), 2020
- 29 CFR 1926 (OSHA), or PSI's Selections
- The four Alaska law documents: Centralized Licensing Statutes, Centralized Licensing Regulations, Construction Contractor Statutes and Regulations, and Electrical Administrator Statutes and Regulations
Other categories
- Unlimited Linework: 2020 NEC, NESC 2020 and the Alaska law documents
- Controls and Control Wiring: 2020 NEC, 2013 NFPA 72, OSHA 1926, Control Systems for HVAC (6th ed.) and the law documents
- Inside Communications: 2020 NEC, 2013 NFPA 72, OSHA 1926 and the law documents
- Outside Communications: 2020 NEC, NESC 2017, OSHA 1926 and the law documents
- Not allowed: the American Electricians' Handbook on Linework, Controls and Communications
Book rules: Highlight, underline, annotate and index before exam day, but don't write in books during the exam. Permanent tabs only. Post-its come off before you start. No extra papers. PDFs printed from the internet must be spiral-bound or in a binder. Bring a silent, non-programmable calculator.
Source: Alaska Electrical Administrators Candidate Information Bulletin, August 20, 2026. JCR checked this list against the bulletin on October 12, 2026. Bulletins change, so open yours the week you book.
Testing for UCW or RW? JCR's Alaska course preps the technical part of both exams: 2020 NEC lookups, theory and calculations.
What you get for $495: 100 video lessons (21 hours), a 152-page JCR workbook, 500+ mock exam questions on paper or online, and permanent code tabs.
Choose your category
Unlimited Commercial Wiring covers inside wiring, including residential, controls and inside communications work. Residential Wiring is limited to homes.
If you don't have 4 years as a commercial journeyman, UCW has other routes:
- You can count years as a field superintendent in inside wiring.
- An electrical engineering degree plus 1 of the past 3 years in the field also works.
- 3 of the past 6 years as a journeyman plus 1 year as an inspector or instructor also works.
- A registered electrical engineer needs 1 of the past 3 years in electrical construction management.
Journeyman certificates are a separate Alaska Department of Labor program. Since August 8, 2025, it accepts journeyman reciprocity applications from other U.S. states without a state-to-state agreement.
Apply, then book your exam
- Send the administrator application and your experience records to the Division of Corporations, Business and Professional Licensing. Include the $320 in fees.
- The Division reviews your experience and sends an eligibility letter. You have one year from that letter to pass, and 12 AAC 32.046 limits you to 3 written-exam attempts in any 12-month period. Each attempt costs $150.
- Book your exam through PSI Alaska Electrical Administrators, the state's testing company.
- After you pass, PSI makes your result available to the Division. Passing scores are good for one year. Passing alone does not issue the license.
The exam and your books
| Exam | Questions | Time | Pass | Fee | Code and focus |
|---|---|---|---|---|---|
| Unlimited Commercial Wiring | 100 | 240 minutes | 70% | $150 | 2020 NEC, NFPA 72 (2013), OSHA 1926 |
| Residential Wiring | 75 | 180 minutes | 70% | $150 | 2020 NEC, 2020 NESC, OSHA 1926 |
Each exam includes 5 Alaska law questions, not a separate law test. The other questions cover technical areas such as grounding and bonding, services, raceways and conductors. Study the 2020 NEC for those. JCR's Alaska course is built on it.
Both categories let you bring four Alaska law documents: the electrical administrator rules, contractor rules, centralized licensing statutes and centralized licensing regulations. For OSHA, you can bring the full 29 CFR Part 1926 or PSI's selected text. The full book list is in the PSI bulletin. American Electricians' Handbook is not on the allowed list.
PSI's book rules allow highlighting, underlining, notes and permanent tabs added before exam day. Removable tabs and extra papers are not allowed. Bind any printed PDFs or put them in a binder. Bring a silent, nonprinting, nonprogrammable calculator.
Other licenses and renewal
If you hold an administrator-level license in another state and passed an equivalent exam, apply by credentials using the license-by-credentials application. Department of Labor journeyman reciprocity does not cover administrator licenses.
Licenses expire December 31 of odd-numbered years. To renew UCW or RW, finish one approved 8-hour NEC course during the two-year period. If you passed the licensing exam during that period, you don't need the course. See the renewal and education rules and the licensing page.
Alaska electrical license questions
What is an Alaska electrical administrator license?
It lets you supervise a contractor's electrical work in Alaska. Most people choose Unlimited Commercial Wiring (UCW) or Residential Wiring (RW). The state approves your experience, then you pass one PSI exam based on the 2020 NEC.
How do I get an Alaska journeyman electrician license?
Journeyman certificates come from a separate Alaska Department of Labor program, not the administrator license. Since August 8, 2025, that program accepts journeyman reciprocity applications from other U.S. states without a state-to-state agreement.
What experience do I need for an Alaska UCW license?
4 of the past 6 years as a commercial journeyman. Other routes use field superintendent years, an electrical engineering degree plus field time, or journeyman years plus a year as an inspector or instructor.
What is on the Alaska electrical administrator exam?
UCW has 100 questions in 240 minutes, and RW has 75 in 180 minutes. You need 70%, and each attempt costs $150. Each exam includes 5 Alaska law questions. The rest are technical and based on the 2020 NEC.
Related: Electrical license requirements by state · Washington · Hawaii
More Alaska guides
Study with JCR
JCR's Alaska package prepares you for the technical part of the UCW and RW exams: 2020 NEC lookups, theory and calculations, practiced against the clock. JCR has taught electricians since 1985, and these lessons come from its classroom course (93% pass rate for JCR classroom students). Study the Alaska law PDFs on your own.
How long: plan for 6–8 weeks, about an hour a night, the pace most passing students keep.
Package contents: a 152-page proprietary JCR workbook, permanent code tabs, 100 video lessons (21 hours) and 500+ realistic mock exam questions you can work on paper or online. Pair it with the 2020 NEC (NFPA 70) and, for UCW, the 2013 NFPA 72.
Get the Alaska self-study package, $495
Videos and practice exams open right after purchase, and the workbook ships the same or next business day.
Want to see the question style first? Try 25 free 2020 NEC practice questions.
Official forms and exam information
- Alaska Electrical Administrators home
- Alaska application and exam instructions
- Applications and forms
- License by examination application (fees)
- Statutes and regulations
- Electrical CIB 2911
- PSI Alaska Electrical
- DOLWD journeyman certificates and reciprocity FAQ
Experience, exam and fee facts checked October 21, 2026 against the Alaska statutes, fee form and PSI bulletin linked above. Rules and fees change, so confirm with the Alaska Division of Corporations, Business and Professional Licensing before you apply.