Skip to content

How to Get a Tennessee Electrical License

JCR Productions electrical license guide

Tennessee has two state options: the Limited Licensed Electrician (LLE) license for jobs under $25,000, and the Electrical Contractor (CE) license for jobs of $25,000 or more. Both exams use the 2017 NEC.

At a glance LLE CE
Who holds it You, as an individual Your company, through a qualifying agent
Job size Under $25,000 $25,000 or more
Experience None required Board prefers 3 years
Exams 1 (LLE trade) 2 (CE trade + Business and Law)
NEC edition 2017 2017
State fees $53 exam + $50 license $53 per exam + $250 application
Statewide CE None. Renew every 2 years ($50) None. Renew every 2 years ($200)

Choose LLE or CE

LLE: a license for you as an electrician, for jobs under $25,000. Job value includes labor and materials. No experience is required. The LLE is not a journeyman, master, or contractor license. You can't advertise as a contractor or split a job to stay under $25,000.

The LLE only works where the state runs electrical permits. Memphis and Shelby County don't accept it. They use their own local license and ICC exams on the 2020 NEC. Other cities and counties may too, so check the state's local permitting list before you pick an exam.

CE: a company license for electrical jobs of $25,000 or more. The Board sets each company's monetary limit from its financial documents. Your company names a qualifying agent, who takes the exams. That person must be an owner, officer, or full-time employee.

Tennessee doesn't set a fixed number of years for CE. The Board reviews the qualifying agent's electrical experience and prefers 3 years. List your experience on the application and attach a letter of reference from a past client, employer, or code official.

One exam for LLE, two for a new CE license

The LLE takes one electrical exam. A new CE Electrical Contractor license takes the electrical trade exam plus Tennessee Contractor Business and Law. Calculations are part of the trade exam, not a third test. You don't need Board approval to schedule these exams.

Exam Questions Time Pass Fee Code and books
LLE 40 2 hours 73% $53 2017 NEC, Ugly's 2020, OSHA 29 CFR 1926
CE Electrical Contractor 100 5 hours 73% $53 2017 NEC, Ugly's 2020, OSHA 1926, American Electrician's Handbook (17th Edition)
Tennessee Contractor Business and Law 50 2½ hours 73% $53 NASCLA Contractors Guide to Business, Law and Project Management, Tennessee (4th Edition)

Book your exam through Prov, the state's testing company. You can test at a center or from home. The August 18, 2026 Prov bulletin lists the 2017 NEC for both LLE and CE. Prov doesn't name an OSHA edition. Older or newer editions are allowed, but questions are scored against the listed edition.

Through January 1, 2027, CE also allows these older references: NFPA 70E (2017), the Handbook for Electrical Safety in the Workplace (2017), and the International Building Code (2021).

Prov's book rules allow highlighting and permanent tabs. Handwritten notes, removable tabs, Post-it notes, photocopies, added sheets, and study guides are not allowed. Bring a simple four-function calculator, or use the one on screen. Scientific, graphing, and programmable calculators are not allowed.

If you fail, you can retest with no waiting period and no attempt limit. Each attempt costs $53.

Other ways to meet the CE trade exam

An approved out-of-state trade-exam waiver or the NASCLA Electrical Contractor exam can replace the CE trade exam. You still take Business and Law and file the company application. The waiver chart lists the licenses that qualify.

The LLE has no out-of-state waiver. A passing CE trade score can be used to apply for the LLE, but an LLE score won't get you a CE license.

Apply after testing

LLE: follow the LLE application instructions and pay the $50 fee through CORE.

CE: follow the contractor application steps. Send the qualifying agent's records, a reviewed or audited financial statement (or the Board's surety-bond option), insurance, company documents, and the $250 fee. Don't bid a $25,000+ job until your license is issued with its monetary limit.

Both licenses renew every two years, with no statewide continuing education. Local licensing and permit rules still apply.

Study with JCR

JCR's Tennessee course teaches the 2017 NEC lookups, calculations, and theory on the LLE and CE trade exams. It's the same material behind a 93% pass rate for JCR classroom students. Business and Law and the NASCLA Electrical exam need separate prep.

How long to study: Most students who pass study 6–8 weeks, about an hour a night.

JCR's Tennessee course ($495) includes a 152-page printed manual, 100 video lessons (21 hours), 500+ practice questions (paper and a digital mock exam), and permanent code tabs. Code books are sold separately.

Get the Tennessee course →

Testing in Memphis or Shelby County? Use JCR's Memphis/Shelby course instead. It's built on the 2020 NEC.