To get a Reno electrical license, you first need a journeyman certificate: Reno's municipal code bars anyone without one from doing electrical installations inside city limits. In Reno that certificate is the Nevada Electrical Qualifications Card, which Electrical Safety Professionals (ESP) issues once you pass an ICC exam built on the 2023 NEC. If you also want to run jobs as a business, the company needs a C-2 from the Nevada State Contractors Board. PSI's C-2 exam is still written to the 2017 NEC.
For the state-level picture, start with how to get a Nevada electrician license. For the contractor test itself, see the C-2 exam breakdown. Reno's own rules are on the city's journeyman card page. Then check your 2017 lookup speed with JCR's free 25-question mock (select Nevada at the start).
Northern Nevada inspects to the 2023 NEC. The C-2 doesn't. PSI writes every C-2 code question from the 2017 edition, and JCR's self-study course teaches exactly that book.
In the $495 box: 100 video lessons running 21 hours, a 152-page printed manual, a printed mock exam, permanent code tabs and an online bank of 300+ questions that includes a 100-question timed mock.
Get the Nevada C-2 course: $495
Rather start free? Take the 2017 mock first.
Reno electrician license requirements by role
| Your role in Reno | What you must hold | How you get it |
|---|---|---|
| Apprentice | Card from an approved apprenticeship program | Enroll in the program |
| Journeyman or residential electrician | ESP journeyman or residential card | 4,000 hours plus ICC R17 or R18 |
| Master electrician | ESP master card | 4,000 hours plus ICC R16 |
| Electrical contractor | NSCB C-2 license | 4 years' experience in the past 15, PSI C-2 and CMS exams |
| Homeowner on own house | No card | Exempt under the city rule |
What Title 14 of the Reno Municipal Code asks for
The city's journeyman card page summarizes Title 14 this way:
- Nobody may perform, or let others perform, electrical installations, alterations or additions in Reno without a valid journeyman certificate.
- The permit page adds that electrical workers need a certificate matching their level: pre-apprentice, apprentice or journeyman.
- Workers under direct supervision are covered when the contractor keeps a written agreement on site naming the supervisors, with contact details and copies of their certifications, for city inspectors.
- Holders of a reciprocal license from another city, county, state or country may work for 12 months. After that they need the local certification.
Permits are filed online through the regional OneNV portal. Reno Permit Services answers at 775-334-2063.
G17 or R17? Settling Reno's exam-code conflict
Reno's card page tells candidates to take ICC's G17 Journeyman or G18 Residential exam. In ICC's own contractor/trades bulletin, those G-series exams are the 2017 NEC versions. ESP, the agency that actually issues Reno's cards, says otherwise: its June 2, 2026 registration guide lists only R16 Master, R17 Journeyman and R18 Residential, all on the 2023 NEC, as acceptable for a new card.
Settled: go with the issuer. ESP's June 2 testing notice calls R16, R17 and R18 the only acceptable exams for a new Nevada card. A G17 or G18 bought now won't get you one. ICC still sells both (its June 30, 2026 bulletin lists them on the 2017 NEC). Cards Reno issued through ICC from 2017 to 2020 stay valid, but cards run three years, and one expired for more than a year needs a retest. ESP stopped accepting 2017 NEC G-series passes for new cards after March 31, 2026, so an earlier G17 or G18 pass that never became a card means retesting on R17 or R18. Reno's page, which still names G17 and G18, hasn't caught up.
Which NEC applies in Reno, Sparks and Washoe County
Reno adopted the 2023 NEC with the 2024 building codes on July 1, 2025, and since January 1, 2026 it reviews plans only under the 2024 set. Washoe County adopted the same editions on the same date. Both apply the 2024 Northern Nevada Amendments written by the Northern Nevada Chapter of ICC, not the Southern Nevada package used around Las Vegas.
Card rules outside Reno are less clear. ESP lists Reno, Clark County, Las Vegas and Henderson as places that demand at least a journeyman card. JCR found no published card rule for Sparks or unincorporated Washoe County. Ask the Washoe County Building Program (775-328-2020) or Sparks before you mobilize there.
On the C-2, forget the local book. The 2017 locations PSI expects:
| Rule | C-2 answer key (2017 NEC) | Where it moved in 2020 |
|---|---|---|
| Conductor ampacity | Table 310.15(B)(16) | Table 310.16 |
| Ambient correction | Table 310.15(B)(2)(a) | Table 310.15(B)(1) |
| More than 3 current-carrying conductors | Table 310.15(B)(3)(a) | Table 310.15(C)(1) |
| Dwelling service 83% rule | 310.15(B)(7) | 310.12 |
Earning the card: Reno journeyman steps
- Bank the hours. New cards need at least 4,000 hours of electrical work or apprenticeship (ESP notice).
- Pass the ICC test in person. R17 is 80 questions in 4 hours, R18 is 60 in 3 hours, both 70% to pass. R16 Master is 100 in 5 hours at 75%. Each is $120, open book with the 2023 NEC and any edition of Ugly's, at a Pearson VUE center. A failed ICC exam can be retaken after 10 days.
- Send ESP your pass letter and hours through its online form. Journeyman and residential cards cost $85. Masters pay $100.
The C-2: licensing a Reno electrical company
Your qualified individual applies through NSCB's northern office at 5390 Kietzke Lane, Suite 102 (775-688-1141). Here is the sequence:
- Application: $300, non-refundable, with a financial statement and bank verification form.
- Exams at PSI Reno: Brainseed Testing Services, 5250 Neil Road, Suite 110. Reno seats Monday, Wednesday, Thursday, Friday and Saturday. The C-2 needs 56 of 80 in 4 hours. The CMS needs 45 of 60 scored items in 120 minutes. $95 for one, $140 for both.
- Retakes: wait 2 weeks after a fail. A third failure voids the application, and you can reapply after 30 days.
- License: $600 for two years, a bond of $1,000 to $500,000 set by the board, and workers' comp proof (NSCB fees).
The C-2 room allows the 2017 NEC or its Handbook and NFPA 72 (2010 or 2013), permanently tabbed and unmarked. Ugly's is not allowed. Coming from another state? NSCB may waive the trade exam. Check Nevada reciprocity.
Two 2017 NEC checks before your C-2
1. Four current-carrying #6 THW copper conductors in one raceway, 120°F ambient. Ampacity?
- 39 A
- 42.6 A
- 52 A
- 65 A
Show answer
A. Start at 65 A (75°C column, Table 310.15(B)(16)). The 114–122°F row of Table 310.15(B)(2)(a) gives 0.75 for 75°C wire, and four conductors take 80% under Table 310.15(B)(3)(a): 65 × 0.75 × 0.80 = 39 A. Grabbing the 90°C factor, 0.82, leads to the 42.6 A distractor.
2. A 1.15 service factor motor won't start with its overload set per 430.32(A)(1). Maximum setting allowed by 430.32(C)?
- 115%
- 125%
- 130%
- 140%
Show answer
D. 430.32(C) permits up to 140% of nameplate full-load current for motors with a service factor of 1.15 or more, or a marked temperature rise of 40°C or less. Every other motor stops at 130%.
Renewing in Reno
The card lasts 3 years. ESP wants 18 CE hours (masters 30), including 8 hours of 2023 NEC changes and 4 of NFPA 70E (provider list). Reno's page says an expired card can be renewed for up to a year with the CEUs, the regular fee and a reinstatement fee. Past one year you must pass the exam again. The C-2 renews every two years at $600.
Reno electrician license FAQ
Do you need a license to be an electrician in Reno?
Yes. The city requires a valid journeyman certificate, issued as the ESP Nevada Electrical Qualifications Card, for anyone doing electrical installations in Reno. Apprentices carry a card from an approved apprenticeship program. Homeowners working on their own homes are exempt.
Should I take the ICC G17 or R17 exam for a Reno card?
R17, on the 2023 NEC. Reno's page still names G17 and G18, which are ICC's 2017 NEC exams. ESP issues the card. It stopped accepting 2017 NEC passes for new cards after March 31, 2026. Its June 2, 2026 notice lists R16, R17 and R18 on the 2023 NEC as the only exams accepted for a new card.
What NEC edition does Reno enforce?
The 2023 NEC with the 2024 Northern Nevada Amendments, adopted July 1, 2025, and required for all plans since January 1, 2026. The NSCB C-2 contractor exam still uses the 2017 NEC.
Does Sparks or Washoe County require an electrician card?
JCR could not find a published card requirement for either. ESP names Reno, Clark County, Las Vegas and Henderson. Call the Washoe County Building Program at 775-328-2020 or the City of Sparks before starting work.
Can I work in Reno with an out-of-state electrician license?
For a while. Reno lets holders of reciprocal licenses work 12 months inside city limits before they must get the local certification. A contracting company still needs an NSCB license, and NSCB may waive the C-2 trade exam by endorsement.
Where JCR fits for Reno candidates
JCR's course targets the C-2: 2017 NEC navigation, calculations and timed practice, finishing with a full 100-question mock. Plan on 6 to 8 weeks. Safety, NESC and Business and Law topics need their own study.
To be clear, the ESP card exams are on the 2023 NEC, and JCR doesn't offer a 2023 course.
Keep reading
Sources
- City of Reno: journeyman cards
- City of Reno: permits and adopted codes
- Washoe County Building Program: codes
- ESP Nevada Electrical Qualifications Program
- ESP: how to register for exams (June 2026)
- ESP testing notice: 2017 NEC cutoff (January 2026)
- ESP testing and fee notice (June 2, 2026)
- ICC contractor/trades bulletin
- NSCB requirements
- NSCB examinations
- PSI Nevada bulletin, March 2026
Reviewed November 6, 2026 using the city, county, ESP, ICC, NSCB and PSI pages above. Quiz answers use the 2017 NEC.