Raleigh – (10+ CEUs) Detailed NEC Workshop: Day 2

When

09/12/2024    
8:00 am - 6:00 pm

Where

Hampton Inn and Suites at Crabtree
3920 Arrow Dr, Raleigh, NC, 27612

Event Type

Day 2: September 12th, 2024 – 8:00am to 6:00pm – 10 CEUs*

(Please Arrive by 7:45 am. Lunch is ‘on your own’ from 12:00 pm – 1:00 pm.)

Detailed NEC Workshop: Day 2 – 10 CEUs

Detailed NEC Workshop

 

Materials Needed: National Electrical Code Book (2020 or 2023), Photo ID, calculator, highlighter.

We provide handouts for you to follow along and take notes.

Where: Hampton Inn and Suites at Crabtree Valley
3920 Arrow Drive
Raleigh, NC 27612
Hotel Phone: 919-881-7080
(Reduced room rates available for JCR workshop attendees. Call hotel directly to book your room.)

 

Add Additional State Reporting

Detailed NEC Workshop: Day 2 is worth 10 CEUs

Hours may vary in additional states

$325.00Read more

This is the second day of our comprehensive Exam Preparation Workshop.

*Please be respectful that the majority of students are preparing for an exam. Code change or field questions should be discussed outside of class with Victor. 

*A COMPLIMENTARY ONLINE COURSE PROVIDED FOR LICENSED ELECTRICIANS: EARN AN ADDITIONAL 8 NON-CLASSROOM CEUs!

Course Outline
Conductors for General Wiring

Conductor Tables & Ampacities
Multiplying vs Dividing 
High Voltage – Article 240
Medium Voltage – Tables 311 

Wire Bending Spaces and Box & Conduit Fill

Wire Bending Spaces – Article 312
Pancake boxes & Domed fixtures
Box volume/Fill calculation – Table 314
Box & Conduit body fill
Counting Conductors
Pull boxes

Cable Tray Fill, Switches & Wireways

Cable Tray Fill – Article 392
Conduit & Tubing Fill

Fixed Electric Space Heating

Space Heating Equipment – Article 424
Branch Circuits 125%

Motors & Motor Circuits

The Six Pack – Article 430
Motor Ampacities
Motor Branch Circuits
Overload Protection
Overcurrent Protection
Motor Controller & Motor Disconnect

Additional Equipment

A/C Equipment – Article 440
Transformers – Article 450

Bonding & Grounding

Article 250 
Electrodes Permitted for Grounding
Grounding Electrode Conductor Sizing & Grounding Electrode Conductor for AC Systems
Grounding Conductor, Main Bonding Jumper, System Bonding Jumper, and Supply-Side Bonding Jumper for AC Systems 
Minimum Sizing Equipment Grounding Conductors for Grounding Raceway & Equipment

Highlight and Interpret

Article 90, 110, 200
Practice and Highlight

Branch Circuits/Outside Branch Circuits & Feeders

Articles 210 and 225
Required Branch Circuits in Dwellings
Intro of continuous loads/continuous duty
Feeders – Article 215

Services & Overcurrent Protection

Articles 230 and 240
Key Points

Wiring Methods & Materials

Chapter 3
Key Points

Book of Specials

Chapters 5, 6, & 7
Hazardous Classified Locations – Articles 500-516
Tables 505 & 506
Healthcare Facilities – Article 517
Mobile Homes & Park Trailers – Article 550 & 552
Floating Buildings & Marinas – Article 553 & 555
Temporary Power & Sensitive Electronic Equipment – Article 590 & 647
Cranes & Hoists – Article 610
Pools & Fire Pumps – Article 680 & 695

Flow & Navigation of the NFPA-72

Code Organization & Layout
Arrangement of Code Chapters
Components of Systems, Appliances, & Devices
Interface of Systems & Chapter 21
Alarm system types
Annex and Index

Business Management, Law, and Safety

Eight basic forms – state license, etc
Elements to a business – delegation, etc
Types of businesses – Sole, S vs C, LLC
Insurance – workmen’s comp, etc
Bonds – six types
Estimating – Take off method, etc
Forms & Bookkeeping – Profit & Loss, etc
Permits & Violations – OHSA, etc