Asheville – (10+ CEUs) Detailed NEC Workshop: Day 1

When

12/10/2024    
8:00 am - 6:00 pm

Where

Holiday Inn & Suites
42 Tunnel Road, Asheville, NC, 28805

Event Type

Day 1: December 10th, 2024 – 8:00am to 6:00pm

(Please Arrive by 7:45 am. Lunch is ‘on your own’ from 12:00 pm – 1:00 pm.)

Detailed NEC Workshop: Day 1 – 10 CEUs*

Detailed NEC Workshop

 

Materials Needed: National Electrical Code Book (2020 or 2023), Photo ID, calculator, highlighter.

We provide handouts for you to follow along and take notes.

Where: Holiday Inn & Suites
42 Tunnel Road
Asheville, NC 28805
Hotel Phone: 828-225-5550
(Reduced room rates for JCR workshop attendees if booked 21 days or more ahead of time. Call hotel directly to book your room or use the Group Code CRC when booking online.)

 

Add Additional State Reporting

Detailed NEC Workshop: Day 1 is worth 10 CEUs

*Hours may vary in additional states

$325.00Select options

This is the first day of our comprehensive Exam Preparation Workshop.

*Please be respectful that the majority of students are preparing for an exam. Code change or field questions should be discussed outside of class with Victor. 

*A COMPLIMENTARY ONLINE COURSE PROVIDED FOR LICENSED ELECTRICIANS: EARN AN ADDITIONAL 8 NON-CLASSROOM CEUs!

Course Outline

Navigating the National Electrical Code

Code Formatting 
History, Chapters & Articles, Arrangement & Format
Arrangement of Chapters – 1-4, 5-7, 8, 9
Navigation Methods of the Code

The Paralleled Numbering System

Commonly Referenced Sections
Administration – Article 90
Definitions – Article 100
Neutral vs Grounded Conductor – Article 200

Basic NFPA Code Requirements

Fire department basic requirements – disconnect, etc
Article Point Flow & Format
Remembering Code Articles – 210 to 250
Basic Code Occupancies – Dwelling vs Non-Dwelling
NEC math formulas – percentage math, volume math
Code navigation methods & recommendations 
Grounded vs Grounding 

Ohm’s Law & Review of Electrical Calculations

Foundational Review
Code Wide Factors – 125%, Rounding, Derations, etc
100 Amp Rule
Required Considerations – continuous, derated, phase, etc 
Single Phase vs Three Phase formula
Wye vs Delta
Article 240

Branch-Circuit, Feeder, & Service Load Calculations

Article 220
Standard, Optional, Derations or Demands
General Lighting Loads & Derations, Receptacle Loads & Derations
Non-Dwelling, Optional Dwelling, Multi-family dwelling, Single family dwelling 
Show Window Lighting, Track Lighting Loads, Motor Loads, Heating Loads
Dwelling appliance loads & derating
Neutral sizing & Neutral derating
Table 220
Practice